Shandong Ligao Hydraulic Machinery Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. peng michael
  • Company Name : Shandong Ligao Hydraulic Machinery Co., Ltd.
  • Tel : 86-531-84236705
  • Fax : 86-531-84236705
  • Address : Shandong,jinan,158# Qiangjin Street of Jibei Development Zone
  • Country/Region : China
  • Zip : 251400

arm aerial work LT,arm aerial work LT,arm aerial work LT

arm aerial work LT,arm aerial work LT,arm aerial work LT
Product Detailed
Related Categories:Lift Tables

Detailed Product Description


ARM AERIAL WORK PLATFORM (GTZ / GKT)

Specification

1.     Main Parameters

Model

Working

height

(M)

Working

 Radius

(M)

Traveling angle

Total

Dimension

(MM)

Total weight

(KG)

Lifting

Speed

(m/s)

Working

Ari pressure

Traveling speed

KFM/H

max endurable wind grade

Loading capacity

(KG)

GTZ-6

7.7

1.5

360

2300x880x2020

500

0.04-0.07

8

15-20

≤5

160

GTZ-8

9.7

2.2

360

2800x1200x2450

700

0.04-0.07

8

15-20

≤5

200

GKT-10.5

10.5

3.4

360

3500x1700x2900

1600

0.05-0.09

10

15-20

≤5

160

GKT-12

12

3.4

360

3800x1900x2900

1900

0.05-0.09

10

15-20

≤5

160

GKT-13

13

4

360

3900x1950x3000

2000

0.05-0.09

10

15-20

≤5

160

2. Operation

 1) Checking diesel engine, transmission case, gear box and oil box before usage to make sure that they are in best working conditions.

 2) Driving like the normal motor vehicles.

 3) Open the landing legs before work. The landing legs must be adjusted to make the machine off the ground and in the same levels.

 4) Manual of up and down. (Shown on the operation pictures)

 5) Checking the electricity power lights before the work.

 6) Lifting by turn to push UP buttons (I, II) and DOWN (I, II).

 7) When it works, the first arm must be lifted to certain height, and then it can be moved in level, and it was forbidden to have people under the platform.

 8) When the power supply is broken down, the platform can be lifted down by pushing the heart of the electromagnetic valve.

3. Notice

 1) Never overloading. 2) Hydraulic system pressure should not pass 8-10Mpa. 3) The wind when the machine works outside must be less than 5 classes. 4) Working in high place must not move violently. 5) When the platform works, the machine should not move around.6) usage forbidden when the landing legs are fold.

4. Common faults and trouble shooting

fault

causes

salvation

oil cylinder leaking

seal components broken or less airproof

changing the components

decline of oil cylinder

eyewinker in

electromagnetic valve

clean the valve or change the components

lower pressure

inlet port blocked, air leakage, oil-in blocked

clean the oil-in, sealing the inlet

dont descend

the electromagnetic valve is broken

change the electromagnetic valve

5. Repairmen and Maintenance

 1) After working, the lift platform must be fold and should be cut power supply off.

 2) The machine should be kept inside room.

 3) The joint of machine must be lubricated frequently.

 4) The hydraulic oil must be changed in two months when the machine is first used. And afterward the hydraulic oil should be changed by the working situations. (Hydraulic oil NO.10 in summer, and winter 30#)

5) The seal ring should be changed immediately when it does not work well.

 6) The hydraulic components must be cleaned enough when they are changed. If the component is not available, the input part of oil cylinder should be sealed to prevent the crash and eyewinker of oil system.

6. Accessories

 1) Certificate of inspection and operation manual.

 2) Tool bag for diesel engine.

 3) Three wrenches.



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.